Sunday, May 29, 2011

Hazardous Repair

Muskrat tunneling and erosion caused by the rise and fall of the water level has produced significant deterioration along the pond bank on #13.  It is important to improve the playability of this area for this season until the Club determines the best course of action for a long term solution.


Bank erosion and playing surface interruption.

 Collapsed areas are filled with soil and tamped.


 The entire area is finished raked and prepared for sod.

 Sod is installed.

 Project completed.

Sod will be hand watered until rooted and established.